As part of the seismic retrofitting of the Hermann Michel school complex (Antilles Seismic Plan – AFD), the municipality of Le Carbet commissioned a project management consultancy (AMO) to study the project's feasibility. As existing network data was insufficient, a comprehensive survey of dry and wet utility networks—including an inventory of septic tanks—was required to decide between demolition-reconstruction and rehabilitation.
Diag Réseaux performed a CCTV inspection of the wastewater and rainwater collectors.
The project management consultancy was provided with a complete and reliable database to weigh the options between demolition-reconstruction and rehabilitation. The exact location of the septic tanks and the actual condition of the collectors allowed for an assessment of the technical and financial constraints associated with each option.
Time-stamped PDF CCTV inspection report with screenshots and coding according to national standards. Detailed inventory of septic tanks.