A Guadeloupe condominium manager, acting on behalf of the condo board, initiated a renovation program for a residential complex's exterior grounds: resurfacing internal roads, repairing pedestrian walkways, creating parking spaces, and replacing the outdoor lighting system. The as-built plans dated back to the initial construction and had not been updated following various ad-hoc repairs. As the condominium remained occupied during the work, the manager wanted reliable mapping to secure the construction site and control the budget approved at the general meeting.
Diag Réseaux surveyed all exterior areas of the condominium, including internal roads, parking lots, and building surroundings. The mission combined electromagnetic detection for conductive utilities and ground-penetrating radar for non-conductive ones. All located utilities—high voltage, low voltage, drinking water, sewage, and stormwater—were surveyed using a GNSS RTK receiver georeferenced in RGAF09. Surface markings were applied on-site to indicate the position of the utilities for the construction crews.
The accuracy class was improved from C to A or B for all main sections. The project manager integrated utility constraints into the execution design phase, anticipating several diversions that would otherwise have been discovered during excavation. The property manager received a document enforceable against the contractors, protecting the condominium's liability and limiting cost overruns during construction.
DWG plans georeferenced in RGAF09 showing utility layouts, estimated depths, and accuracy class per section. Surface markings within the intervention area. PDF detection report documenting methods, measurement uncertainties, and recommendations for sections remaining in class C.